When Remodeling a Kitchen, What Comes First?

October 12, 2025

Remodeling your kitchen is one of the best ways to add value, functionality, and beauty to your home — but getting started can be confusing. There are so many moving parts that homeowners often ask the same question: When remodeling a kitchen, what comes first?

The answer depends on your goals, but generally, the first step is planning. Jumping into demolition or ordering cabinets too soon can lead to costly mistakes and delays. Here’s how to tackle your remodel in the right order from the very beginning.


Step 1: Define Your Vision and Budget

Before you do anything else, take time to define what you want from your new kitchen.
Do you need more space? Better flow? Modern finishes? More storage?

Once you know your priorities, create a realistic budget. Include costs for materials, labor, permits, and a 10–15% cushion for surprises. This helps you and your contractor make informed decisions later.


Step 2: Work With a Designer or Contractor Early

The best remodels start with collaboration. Bringing in a professional early ensures your design is not only beautiful but practical. An experienced remodeling team can help you visualize layouts, select materials, and create a step-by-step plan that maximizes your space.


Step 3: Create the Design and Layout

Once your goals and budget are clear, you’ll move into the design phase. This is when you’ll finalize your kitchen layout, choose cabinet styles, select countertops, and determine lighting placement.

During this stage, think carefully about workflow — your “work triangle” (the sink, stove, and refrigerator). An efficient layout saves steps and makes cooking enjoyable.


Step 4: Order Materials and Secure Permits

Before construction begins, order your big-ticket items like cabinets, appliances, and fixtures. Many of these have long lead times, so ordering early avoids delays later. You or your contractor should also apply for any required permits to stay compliant with local building codes.


Step 5: Begin Demolition

Now it’s time for demo day! Old cabinets, flooring, and fixtures are removed to make way for your new design. Be sure to disconnect utilities and protect adjacent rooms from dust before work begins.


Step 6: Rough Work — Plumbing, Electrical, and Framing

Once the space is stripped down, electricians and plumbers can safely access walls and floors. Any framing changes — like removing or adding walls — happen now. This stage ensures your kitchen’s foundation is strong and up to code.


Step 7: Walls, Paint, and Flooring

After inspections are complete, drywall goes up and the first coats of paint are applied. Depending on the project, flooring may go in before or after cabinetry.


Step 8: Cabinetry, Countertops, and Fixtures

Your vision really starts to take shape now. Cabinets and countertops are installed, followed by backsplash tile, lighting, and plumbing fixtures.

Each step builds upon the last — which is why getting the order right from day one is so important.


Step 9: Final Touches and Cleanup

Once everything’s installed, you’ll add the finishing details — hardware, trim, and décor. Then comes inspection, cleanup, and the best part: stepping into your new kitchen for the first time.


Final Thoughts

When remodeling a kitchen in Pine Plains, the key is sequence. Start with planning, partner with the right professionals, and follow a logical order. Doing things in the wrong order can lead to frustration and wasted money — but doing it right creates a kitchen that will serve your family beautifully for years to come.